1. Preparation
Step 1: Site Survey
Our Site Technician will visit your property to confirm the specifics of your solar installation plan and evaluate your roof’s condition.
Timeline: 1-5 Days
Step 2: Blueprints
After the survey, we review any necessary adjustments to ensure the design meets your expectations and aligns with our technical standards.
Timeline: 1-2 Days
Step 3: Permitting
We take care of all the required paperwork and permits from the city or county. You’ll be kept informed throughout the process until everything is approved.
Timeline: 2-6 Weeks
2. Construction
Step 4: Roofing
We handle any roof repairs or replacements, ensuring that your home is fully prepared for the solar panel installation. No need to worry about hiring third-party contractors—we do it all!
As Needed
Step 5: Solar Installation
Our expert installers will set up your solar panels with precision. Most installations take just one day, causing minimal disruption to your daily life.
Timeline: 1-2 Days
Step 6: Electrical
We complete all the necessary electrical work to ensure your solar system integrates seamlessly with your existing electric panel and wiring.
Timeline: As Needed
3. Final Inspections
Step 7: Installation Inspection
We schedule an inspection with the city to verify that your system meets all local codes and safety regulations.
7 Days After Completion
Step 8: PTO (Permission to Operate)
We work closely with your utility company to finalize the connection and install a new meter. This is the final step before you can activate your system.
3 Weeks After Final Inspection
Step 9: Power On!
Once the utility company grants permission to operate (PTO), we will turn your system on, and you can start enjoying the benefits of clean, renewable solar energy.